Illustrative view: cold aisle between server racks inside a modern data centre hall

Project Boreas

The opportunity
In Europe, power is the bottleneck. This site comes with 550 MW.

European data-centre demand is no longer constrained by capital or hardware. It is constrained by access to power, land and permits, and sites with a clear path to power command a premium.

 

Project Boreas is built around exactly that scarcity: a 46.2 ha greenfield site in the Freeport of Ventspils with 550 MW of grid capacity via a 330 kV connection to AST, Latvia’s transmission system operator. Kodo GE delivers the enabled site; the operator brings the data-centre build, capital and tenants, and the campus is sized to the operator’s requirement.

Main info
Location: Ventspils, Latvia
Zone: Freeport of Ventspils SEZ
Jurisdiction: EU · Eurozone · NATO
Category: AI / hyperscale data centre
Status: Greenfield, pre-construction
Specifications
Grid capacity: 550 MW at 330 kV
Site: 46.2 ha, plus ~35 ha SEZ land by lease
Zoning: Data-centre use confirmed by the municipality
First power: About 1.5–2.5 years (indicative)

One transaction, one enabled site. Kodo GE offers the project company together with the land to a qualified buyer, who takes design, build and operation forward. Terms are shared under NDA.

A combination most greenfield sites never assemble.

Transmission-grade power
A 330 kV line and a 110 kV line cross the site and 20 kV is at the boundary, supplied from two directions on a loop. The 550 MW connection is to AST’s 330 kV network, so no new transmission line is needed.

 

Cooling water on site
A natural water source on site can supply cooling without drawing on municipal supply: a structural cost and ESG advantage for high-density, liquid-cooled AI loads. Abstraction terms are set during permitting.

Waste heat into district heating
The city heat network is about 1 km away, so excess heat can be sold rather than rejected. This is the Nordic model, where operators are paid for recovered heat.

 

Fibre, access and room to grow
Trunk fibre runs on the parcel and an asphalt road runs alongside the plots. The 46.2 ha core can grow with about 35 ha of adjacent SEZ Authority land, available by lease.

The path to first power

Indicative timeline from share transfer to energisation. Permitting and design run in parallel with transformer manufacture, which sets the critical path. Updated October 2026.
Site & grid basis
46.2 ha with data-centre use confirmed by the municipality; 550 MW permitted load at 330 kV under AST’s technical requirements.
Teaser & NDA
A mutual NDA opens the data room: site dossier, AST documentation and technical data pack.
Site visit & meetings
On-site review with government and institutional stakeholders.
Permits & design
Building permit in about 3 months; design 6–10 months, with approvals in 15 working days.
Transformers & build
Transformers ordered on day one, about 18–24 months lead time; construction and substation build run alongside.
First power, about month 25

Project Boreas
in brief

Three adjoining parcels totalling 46.2 ha in the Freeport of Ventspils, on Latvia’s Baltic coast. The land is zoned industrial, and the municipality has confirmed data-centre use in writing. About 35 ha of adjacent SEZ Authority land is available by lease.

550 MW of permitted load at 330 kV, under AST’s technical requirements for the connection. The 330 kV lines run next to the site, so no new transmission line is needed. Technical parameters and documentation are shared under NDA.

About 1.5 to 2.5 years from share transfer, depending on the buyer’s construction programme and equipment delivery. Transformer manufacture (about 18–24 months from order) is the critical path; permitting and design run in parallel.

The parcels are inside the Freeport of Ventspils Special Economic Zone, whose published regime can include corporate income tax and property-tax relief for licensed companies, alongside possible state co-financing routes. These are routes the project can pursue, not approvals held today; details are shared under NDA.

As a single transaction: the project company together with the land. The buyer brings the data-centre design, build, capital and tenants. Terms are shared under NDA; no price is quoted publicly.

Request the
Boreas data room

A mutual NDA opens the full site dossier, AST documentation and the technical data pack. Site visits and meetings in Latvia can be arranged for qualified buyers. Figures are indicative and subject to confirmation in due diligence.
Project Zeus
Next Project:

Project Zeus

We use cookies to enhance your browsing experience and to analyse site usage.

By clicking “Accept” or continuing to browse the site, you consent to our use of cookies. To learn more about how we use cookies and your choices, please see our Privacy Policy.